Planning guide
Co-op and condo renovations in NYC: board approval, alteration agreements and permits
An apartment renovation answers to two authorities at once: your building and the city. Knowing which one decides what saves weeks of back-and-forth.
Short answer
In a New York City co-op or condo, two approvals run side by side. The building approves the work under its alteration agreement, its own document setting the terms for renovating a unit. The city approves it through DOB permits where needed, and since February 2, 2026 the board's representative attests in DOB NOW that the board authorized the filing.
- Who it is for
- Owners of co-op shares or condominium units in Manhattan, Queens, Brooklyn and the Bronx
- What it covers
- Apartment kitchen, bathroom and full-apartment renovations
- When to read it
- Before you sign a contractor agreement, order materials or book demolition
Two approvals, two authorities
| Approval | Who gives it | What it decides |
|---|---|---|
| Building approval | Co-op board or condo board, usually through the managing agent | Whether and how the work may be done in the building, under the proprietary lease or condo bylaws and the building's alteration agreement |
| Government permit | NYC Department of Buildings (DOB), plus the Landmarks Preservation Commission (LPC) in designated buildings | Whether the work meets city codes, where the scope needs a permit |
Building approval is a private decision made under the building's own documents. It does not replace a DOB permit, and a DOB permit does not oblige the building to allow the work. Plan for both from the start.
DOB expects the board's authorization. When a condo unit owner or a co-op tenant-shareholder files with DOB, the filing names that owner type and includes an owner's attestation that the condo or co-op board authorized the application. DOB has also announced that, from February 2, 2026, the board itself is added as a stakeholder on those filings and its representative must attest to that authorization. In practice, the board's sign-off comes before the city filing, not after it.
What an alteration agreement usually covers
There is no citywide standard form. Each building writes its own agreement and house rules, and two buildings on the same block can ask for very different things. These are the topics that commonly appear, so you know what to look for:
- Plans and a written scope submitted for review, sometimes by the building's own architect or engineer, often with a review fee
- The contractor's insurance certificates, in the exact form and with the named parties the building requires
- Working days and hours, elevator reservations, and how materials and debris move through the building
- Protection for hallways, elevators and lobbies, and rules on dust and noise
- Limits on moving a kitchen or bathroom, especially wet areas over a neighbor's living space
- A deposit or fee, and a deadline for finishing the work
- Close-out steps, such as a final inspection by the building or proof that permits were signed off
When the city gets involved
Permits. DOB lists painting, new cabinets and floor resurfacing as examples of work that does not need a permit, while more complex kitchen and bathroom work may need one. In New York City, plumbing work can only be done by a Licensed Master Plumber, and electrical work needs its own permit filed by a licensed electrical contractor. Home improvement contractors working in the city need a license from the Department of Consumer and Worker Protection (DCWP).
Occupied buildings. Most co-op and condo renovations happen while neighbors are home. DOB requires that construction documents for an alteration in a building that stays occupied include a Tenant Protection Plan, which identifies the occupied units and describes how occupants' safety and health are protected, for example through dust containment and fire safety. DOB says a TPP cannot be waived where dwelling units are occupied, and a registered architect or professional engineer prepares it.
Asbestos and lead. Before DOB issues alteration permits, building owners must have an asbestos survey done by a DEP-certified investigator to determine whether the work may disturb asbestos-containing material. EPA lead-safe rules apply to paid work that disturbs paint in housing built before 1978, and NYC Local Law 1 of 2004 requires owners of rental units in buildings built before 1960 to presume lead-based paint is present.
Landmarks. In a designated building, LPC says an interior permit is required when the work needs a DOB permit, when interior work affects the exterior, or when the interior itself is a designated interior landmark. Check the address on LPC's Discover NYC Landmarks map before plans are drawn.
Working hours: the city's rule and the building's rule
The Department of Environmental Protection allows construction between 7 a.m. and 6 p.m. on weekdays; at other times, including weekends, after-hours authorization is required. Anyone doing construction in the city must also have a Construction Noise Mitigation Plan before work starts. Many co-op and condo buildings set narrower hours in their own rules. Where they do, the schedule follows the narrower window, and the number of working days in the estimate should reflect it.
Who supplies what
| Item | Usually comes from | When it matters |
|---|---|---|
| Alteration agreement and house rules | The building or its managing agent | Before design is final |
| Plans and the DOB filing | A registered architect or engineer | Where the scope needs a DOB permit |
| Board authorization for the filing | The co-op or condo board | Before the DOB application is submitted |
| Tenant Protection Plan | A registered architect or engineer | Where other units stay occupied during an alteration that needs it |
| Asbestos investigation | A DEP-certified asbestos investigator | Before DOB alteration permits |
| Insurance certificates | The contractor and its trade subcontractors | With the alteration agreement, in the form the building asks for |
| Home improvement contractor license | The contractor (DCWP license) | Before you sign; check it on DCWP's lookup |
| Plumbing and electrical filings | A Licensed Master Plumber and a licensed electrical contractor | Where that work is in the scope |
Where this matters most
Apartment renovations under board rules are a large share of the work in Manhattan and are common in Queens and Brooklyn. In the Bronx, about 61% of housing units are in buildings with 20 or more units, so the building's rules often shape a kitchen or bathroom project before the design does. Our bathroom and kitchen teams build the agreement's requirements into the written scope and schedule.
| Area | In 1- or 2-unit buildings | In buildings with 20 or more units |
|---|---|---|
| Queens | 46% | 33% |
| Brooklyn | 28% | 39% |
| the Bronx | 20% | 61% |
| Staten Island | 82% | 8% |
| Manhattan | 3% | 79% |
| Suffolk County | 88% | 4% |
A realistic order of steps
- Ask the managing agent for the alteration agreement, house rules and any plumbing or waterproofing requirements as soon as you decide to renovate.
- Settle the layout against those rules, especially any move of a sink, toilet, shower or range.
- Have the design professional confirm which DOB filings the scope needs, plus LPC where the building is designated.
- Submit the package to the building, then file with DOB once the board has authorized it.
- Order long-lead materials only after both approvals are in hand.
- Book elevator time and confirm working hours before demolition is scheduled.
Planning the work itself? See our pages on whole-home renovation in Queens and kitchen remodeling in Queens.
When the approvals are mapped out, our co-op and condo renovation service page explains how we plan and run the work itself. Just closed on the apartment? Our playbook for renovating before you move in puts these steps around a closing date. Working on a studio or a one-bedroom? Our small-apartment renovation guide covers layout and storage at that scale.
Planning aid
Co-op and condo pre-check
- I have the building's current alteration agreement and house rules.
- I know whether the building reviews plans with its own architect or engineer, and the fee.
- I know which fixtures the building allows to move.
- I know whether the scope needs a DOB permit and who will file it.
- The board knows it will need to authorize the DOB filing.
- I have checked the contractor's DCWP home improvement license.
- The contractor can supply insurance certificates in the building's exact form.
- Working hours and elevator bookings are in the schedule.
From planning to a project
Plan this with us: Bathroom remodeling by area
- Bathroom remodeling · Queens Bathroom remodeling for Queens houses and apartments Compact 1940s and 1950s baths re-planned around the existing drains
- Bathroom remodeling · Brooklyn Bathroom remodeling in Brooklyn's older houses Layouts planned around the existing drain and vent stack
- Bathroom remodeling · The Bronx Bathroom remodeling in the Bronx, apartment or house Apartment bathrooms scheduled to the building's alteration agreement
- Bathroom remodeling · Manhattan Manhattan bathroom remodeling, built to protect the ceiling below Waterproofing planned for a floor that sits over a neighbor's ceiling
- Bathroom remodeling · Staten Island Staten Island bathroom remodeling, from refresh to full renovation Refresh-or-renovate advice based on the room's condition, in writing
- Bathroom remodeling · Suffolk County Bathroom remodeling for Suffolk County homes Permits and plumbing filings through your town or village building office
Sources
- B25024 Units in Structure, Bronx County, ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
- B25034 Year Structure Built, Bronx County, ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-02.
- Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-02.
- Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-02.
- Project Requirements for Owner: Plumbing, NYC Department of Buildings. Accessed 2026-11-02.
- License Checklist: Home Improvement Contractor, NYC Department of Consumer and Worker Protection. Accessed 2026-11-02.
- Asbestos Abatement, NYC Department of Environmental Protection. Accessed 2026-11-02.
- Lead Renovation, Repair and Painting Program Rules, U.S. Environmental Protection Agency. Accessed 2026-11-02.
- Lead-Based Paint, NYC Department of Housing Preservation and Development. Accessed 2026-11-02.
- Landmark Status Letter, NYC Landmarks Preservation Commission. Accessed 2026-11-08.
- Project Requirements: Alteration in 1-2 Family Buildings (owner), NYC Department of Buildings. Accessed 2026-11-02.
- Project Requirements: Asbestos, NYC Department of Buildings. Accessed 2026-11-02.
- DOB NOW: Build Frequently Asked Questions, NYC Department of Buildings. Accessed 2026-11-18.
- Condo/Co-Op Board Added as a Stakeholder in DOB NOW: Build (service notice), NYC Department of Buildings (January 8, 2026). Accessed 2026-11-18.
- Project Requirements - Registrant - Multiple Dwelling Units (Alterations), NYC Department of Buildings. Accessed 2026-11-18.
- TPP Frequently Asked Questions, NYC Department of Buildings. Accessed 2026-11-18.
- Construction Noise Rules & Regulations, NYC Department of Environmental Protection. Accessed 2026-11-18.
- Permits and Making Alterations, NYC Landmarks Preservation Commission. Accessed 2026-11-18.
- B25024 Units in Structure, ACS 2024 1-year estimates (Queens, Kings, Bronx, Richmond, New York and Suffolk counties), U.S. Census Bureau (ACS 2024 1-year release). Accessed 2026-11-20.
Renovating a co-op or condo apartment?
Send us the building's alteration agreement or house rules with a few photos. We build its requirements into the written scope and schedule.