Co-op and condo renovation

Co-op and condo renovation in New York City

NYC Licensed Home Improvement Contractor License #2139648-DCWP

Renovating an apartment in a co-op or condo usually means two separate approvals: the building's, under its alteration agreement, and the city's, when the scope needs a Department of Buildings permit. Planning the kitchen or bathroom around both from the start keeps the schedule realistic and avoids redesigning after the board has looked at the plans.

White shaker kitchen with stainless appliances, gray countertops and two stools at a peninsula

Scope

What the work can include

Every project is scoped individually. This is what is typically part of the work, not a package.

  • Reading the alteration agreement and house rules before the scope is written
  • Kitchen renovations planned around the existing plumbing, or with changes the building reviews
  • Bathroom renovations, including tub-to-shower conversions, waterproofing and tile
  • Flooring, painting and finish work, with any underlayment the building requires
  • Protection of halls, elevators and common areas as the building specifies
  • A written schedule that follows the building's working hours

New York homes

What is different here

  1. Every building writes its own rules

    There is no citywide standard alteration agreement. Each co-op or condo sets its own requirements in the alteration agreement and house rules, so the same kitchen can be straightforward in one building and restricted in the next.

  2. Two approvals, not one

    Building approval is a private decision under the proprietary lease, bylaws or alteration agreement, and it does not replace a DOB permit where the work needs one. A DOB permit does not replace the board's approval either.

  3. Working hours

    Citywide, DEP allows construction between 7 a.m. and 6 p.m. on weekdays; other times, including weekends, need after-hours authorization. Where the building sets narrower working hours, the schedule follows the narrower window.

Building approval

What a board package involves

Requirements are building-dependent, but most alteration packages ask for some version of the same items. The managing agent can confirm the current list for your building.

  • The alteration agreement: signed by the shareholder or unit owner, it sets the rules for the project, from what work is allowed to how the building is protected.
  • Plans and a scope of work: many buildings send these to their own architect or engineer for review, especially for kitchens, bathrooms and anything that touches plumbing.
  • Insurance certificates: the building specifies the coverage, the limits and the parties to be named; the certificate has to match its wording.
  • Working hours and duration: many buildings allow work only on certain weekdays and hours, and some set a maximum project length.
  • Elevator bookings and protection: deliveries and debris removal are often limited to a service elevator that has to be booked, with halls and elevator cabs protected.
  • Deposits and fees: some buildings ask for a security deposit or review fees, set by the building.

The co-op and condo renovation approvals guide walks through the package step by step.

Layout limits

Wet over dry, and what buildings may not allow

A "wet over dry" rule means a kitchen or bathroom may not be moved so that it sits above a living room or bedroom in the apartment below. Many co-ops and some condos apply it to protect neighbors from leaks.

  • Moving a kitchen or bathroom: may be refused under a wet-over-dry rule, or allowed only with added waterproofing and the board engineer's review.
  • Changes to building systems: risers, gas lines, building walls and shared structure are usually controlled by the building, not the apartment owner.
  • Hard flooring: many buildings require sound-attenuating underlayment, or limit how much of the floor can be hard surface.
  • Washers, dryers and dishwashers: some buildings allow them only under conditions, or not at all.

Reading these rules before design starts is faster than redesigning after the board responds.

City approval

The DOB filing route for apartment work

DOB lists plumbing fixture replacement and installing new cabinets among examples of minor work that may not need a permit. Most kitchen and bathroom renovations that need plans are filed with DOB as an ALT2 application by a New York State licensed professional engineer or registered architect. NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber.

When a unit owner or tenant-shareholder files, the owner type is entered as Condo Unit or Co-Op Tenant Shareholder, and the owner attests that the board has authorized the filing. Since February 2, 2026, the board is also a stakeholder on those DOB NOW filings. In DOB's words, "Condo/Co-Op Board will be a Stakeholder on the job filing in DOB NOW when the Owner Type is Condo Unit Owner or Co-Op Tenant-Shareholder. The Board's representative will be required to attest that the Board has authorized the applicant to file the application."

DOB requires that construction documents for an alteration in a building occupied during construction include a tenant protection plan, which identifies the occupied units and the means and methods used to protect the occupants. DOB says the plan cannot be waived if there are occupied dwelling units, and a registered architect or professional engineer submits it.

Whether your renovation needs a DOB permit, which filings apply and what the building requires all depend on the scope and the address. Those requirements are identified in the written proposal, before work is scheduled.

First steps

Kitchens and bathrooms in co-ops: where we start

  1. The building's documents first. The alteration agreement, house rules and any wet-over-dry or flooring rules decide what the design can be.
  2. The existing plumbing. Planning the sink, dishwasher, toilet and shower where the lines already are keeps the plumbing work and the building review smaller.
  3. The unit below. Waterproofing in the bathroom, and how leaks are prevented during the work, matter more in an apartment than in a house.
  4. The schedule the building allows. Working hours, elevator bookings and any maximum duration shape the sequence before a start date is set.
  5. A written scope. The scope and selections are written down so the board package, any filing and the proposal all describe the same project.

Tub-to-shower conversions in apartments follow the same order; the tub-to-shower conversion guide covers the bathroom decisions.

Process

How MMA Construction & Remodeling runs a co-op and condo renovation project

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Questions

Co-op and condo renovation: common questions

How long does co-op board approval take?
It varies by building, and no one can promise a date in advance. The time depends on how complete the package is, whether the board's architect or engineer reviews the plans, how often the board or managing agent reviews applications, and whether questions come back. When the scope also needs a DOB filing, the board's attestation in DOB NOW is a separate step on the city side. Ask the managing agent for the building's usual review steps before setting a start date.
Can you renovate a co-op kitchen without moving plumbing?
Often, yes. Keeping the sink and dishwasher where the existing lines are avoids new drain and vent runs and keeps the building review simpler. DOB lists plumbing fixture replacement and installing new cabinets among examples of minor work that may not need a permit. NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber. The building may still need to approve the work under its alteration agreement.
What insurance does a co-op require from a contractor?
Each building sets its own requirements, usually in the alteration agreement: the types of coverage, the minimum limits, and the parties that must be named on the certificate. Ask the managing agent for the current requirements at the start, because certificates usually have to match the building's exact wording before work can begin.

Sources

  1. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-28.
  2. Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-28.
  3. Project Requirements for Owner: Plumbing, NYC Department of Buildings. Accessed 2026-11-28.
  4. DOB NOW: Build FAQs (Other), NYC Department of Buildings. Accessed 2026-11-28.
  5. Service Notice: Condo/Co-Op Board Added as a Stakeholder in DOB NOW: Build (January 8, 2026), NYC Department of Buildings. Accessed 2026-11-28.
  6. Project Requirements: Alteration, Multiple Dwelling, Site Requirements, NYC Department of Buildings. Accessed 2026-11-28.
  7. Tenant Protection Plan: Frequently Asked Questions, NYC Department of Buildings. Accessed 2026-11-28.
  8. Construction Noise Rules and Regulations, NYC Department of Environmental Protection. Accessed 2026-11-28.