Whole-home renovation

Whole-home renovation in NYC and Suffolk County

Renovating several rooms at once is less disruptive when it is sequenced properly: demolition, rough-in, inspections and finishes in the right order.

Bright living room in an older house with tall windows, a white mantel fireplace, a curved sofa and a jute rug

Scope

What the work can include

Every project is scoped individually. This is what is typically part of the work, not a package.

  • Interior renovation across multiple rooms
  • Kitchens and bathrooms as part of a wider plan
  • Drywall, ceilings, trim and doors
  • Flooring throughout and interior painting
  • Electrical and plumbing changes, which may require appropriately licensed specialty contractors
  • A single schedule and a single point of contact

New York homes

What is different here

  1. Two-family homes

    Renovating one unit while the other is occupied takes careful scheduling, dust control and access planning.

  2. Older homes

    Homes built before 1978 may contain lead-based paint. Federal lead-safe work rules apply to renovation in those homes, and certification is confirmed before any such work is offered.

  3. Not in current scope

    Additions, structural alterations, roofing and new construction are not offered at this stage.

Order of work

Phasing a multi-room renovation

A whole-home interior renovation works when it is planned as one project and built in a logical order: behind-the-wall work first, finishes last. Doing the kitchen this year and the floors next year can mean tearing up new work to run wiring or pipes.

  1. Investigate: what the house has (wiring, plumbing, painted surfaces, possible asbestos materials) and what needs approvals.
  2. Rough work: plumbing, electrical and HVAC changes while walls and floors are open; some may require appropriately licensed specialty contractors.
  3. Close-up: insulation where appropriate, drywall or plaster repair.
  4. Finishes: cabinets, tile, flooring, trim and paint, generally working from the top of the house down so finished floors are protected.

The whole-home renovation guide goes deeper on what to do first.

Living there during work

Planning around an occupied home

Many owners of two-family houses live in one unit or have tenants in the other. That shapes the plan: which rooms stay usable, how dust is contained, where materials are stored, and how water or power shutoffs are scheduled and announced.

Older housing adds rules. Federal EPA rules require certified firms and lead-safe work practices when paid work disturbs paint in housing built before 1978. In New York City, building owners must have an asbestos survey done by a DEP-certified investigator to determine whether work may disturb asbestos-containing material.

Choosing the right page

Is this a whole-home project or a single-room job?

  • One room with a defined scope: start with kitchen, bathroom, basement or flooring and painting.
  • Two or more rooms, or work that shares plumbing and electrical runs: plan it here as one interior project.
  • Additions, structural changes, roofing and new construction are not in scope for this service.

Scope clarity

In scope and not offered

  • What this service covers: interior renovation across two or more rooms of a single-family or two-family house, planned as one project: kitchens and bathrooms as part of the wider plan, drywall and ceilings, trim and doors, flooring and interior painting. Some electrical and plumbing work may require appropriately licensed specialty contractors. General "interior renovation" requests start here; there is no separate interior-renovation service.
  • Layout changes within limits: non-structural partitions can be planned. Removing or altering load-bearing walls, beams, joists or foundations is a structural alteration and is not offered at this stage.
  • Older-home steps: lead-safe work and asbestos checks are handled by appropriately certified professionals, as described above; they are not homeowner tasks.
  • Not offered for any service at this stage: additions, structural alterations, roofing, new homes, and converting space into a rental unit or basement apartment.
A whole-home plan that depends on structural work, an addition or a new rental unit is recorded as outside the current scope instead of being priced. A licensed architect or engineer is the right first call for those.

Before the first conversation

What to have ready, and what we will ask

Helpful to have ready. None of this is required, and rough answers are fine.

  • A list of the rooms you want to change, in priority order, with must-do and nice-to-have marked.
  • Photos of each room, plus any existing floor plans or drawings.
  • The approximate year the house was built and any past renovation or permit history you know about.
  • Which rooms must stay usable during the work, such as one bathroom or the kitchen.
  • In a two-family house, which unit is being renovated and whether the other unit is occupied.

Questions the first conversation is planned to cover. They decide what goes into the written scope.

  • Which rooms share plumbing or electrical runs, so they can be opened and closed together.
  • Whether any part of the plan depends on moving or removing a wall.
  • Whether you plan to stay in the house during the work or arrange temporary space.
  • Which finish decisions are already made and which are still open.
  • Whether there is a date the household is planning around, so phasing can be discussed. Any schedule is set only after a written scope.

For sequencing detail, see whole-home renovation: what to do first.

Process

How a project runs

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Design inspiration

Styles and materials to talk through

Living room in a house with a stacked-stone fireplace, a timber mantel, a white staircase and wide-plank floors
Modern farmhouse kitchen with white shaker cabinets, a marble island with wood stools and tall black-framed windows
Detached Tudor-style house with half-timbered gables, a brick chimney, a stone porch and a front lawn

Questions

Common questions

Can we stay in the house during the renovation?
Often, depending on scope. We plan phases so you keep a working kitchen or bathroom where possible.
Do you do additions or structural work?
Not at this stage. Those services are outside the current scope.
Who manages the trades?
One project lead coordinates the schedule and the trade partners for each part of the work. Some regulated work may require appropriately licensed specialty contractors.
Can we stay in the house during a whole-home renovation?
Often, with a plan for usable rooms, dust control and utility shutoffs. Some phases, such as work on the only bathroom or kitchen, may make temporary arrangements worth considering. See living at home during a renovation.
Does an older house need lead or asbestos checks first?
For paid work that disturbs paint in housing built before 1978, EPA lead-safe rules apply. In NYC, an asbestos survey by a DEP-certified investigator is required to determine whether work may disturb asbestos-containing material. These steps are handled by certified professionals, not by the homeowner.
Do you offer interior renovation as a separate service?
Interior renovation across several rooms is this service. Single rooms start on the kitchen, bathroom, basement or flooring and painting pages.

Ready to talk about your project?

Call or email us to talk it through and arrange a consultation.