MMA ConstructionConstruction & Remodeling Call MMA Construction

Flooring · Brooklyn

Brooklyn flooring installation for pre-war rowhouses and apartments

NYC Licensed Home Improvement Contractor License #2139648-DCWP

In Brooklyn we lay hardwood, engineered wood, vinyl plank and tile floors in rowhouses, two- to four-unit buildings, co-ops and condos. Pre-war floors rarely come up in a single layer, so our project lead opens an edge, checks the plank subfloor and the joist direction, and plans thresholds and radiators before anything is ordered.

  • Plank subfloors checked for moisture, fastening and joist direction
  • Radiators, old thresholds and sloping rooms planned room by room
  • Paint rules for older rental buildings flagged at the planning stage
Empty bedroom with light oak flooring and black-framed windows

Scope

Flooring work we take on in Brooklyn homes

Most Brooklyn jobs start on an older floor: strip oak under carpet, a stack of layers in the kitchen, and a board subfloor below it all. The written scope says which layers stay and which come out.

  • Hardwood and engineered wood over sound board or plywood subfloors
  • Added plywood where the product's instructions call for more subfloor thickness
  • Vinyl plank and tile in kitchens, bathrooms and garden-level rooms
  • Leveling of dips and humps to the tolerance of the chosen product
  • Floors run around radiators, or under them with a plumber lifting the unit
  • Thresholds and reducers where neighboring rooms end up at different heights
  • Baseboard and shoe molding removed and reset; in pre-1960 rental buildings we flag painted trim for the owner first

Process

How MMA Construction & Remodeling runs a flooring project

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Brooklyn

What shapes a flooring job in Brooklyn

  1. Pre-war board subfloors and the direction of the joists

    Nearly half of Brooklyn housing units, 48.4%, are in buildings from 1939 or earlier, so a new floor usually goes over a board subfloor that has moved with the seasons for decades. One solid hardwood maker requires its flooring to run perpendicular to the joists unless the subfloor is made thicker, and wants the subfloor's moisture content within 4% of the flooring's, or 2% for boards 3-1/4 inches or wider. In a rowhouse the joists commonly span between the party walls, which can settle the board direction before style does. We check both at the site visit.

  2. Radiators, marble saddles and rooms that are not level

    Floor-standing radiators have supply pipes through the floor, so a new floor is either cut neatly around each one or the radiator is disconnected and lifted while the floor runs under it. Lifting the radiator means a plumber. Old marble thresholds at bathroom doors and floors that fall from front to back are common at this age. We mark every radiator, saddle and height change on the plan; a slope caused by settled framing is structural work outside our scope.

  3. Two- to four-unit buildings with tenants

    About 32% of Brooklyn housing units are in two- to four-unit buildings, where a floor job often affects tenants as well as the owner. HPD explains that under Local Law 1 of 2004, owners of pre-1960 multiple dwellings and of tenant-occupied units in pre-1960 one- and two-family houses must presume the paint contains lead and address lead-paint hazards, particularly where a child under six lives, and that landlords have work disturbing paint of unknown lead content done by certified contractors using safe work practices. Pulling baseboard and undercutting painted casings can disturb that paint. If your building is covered, those duties are yours as the owner, so we point out the painted trim a floor job would touch before anything is scheduled, and HPD’s page explains what you need to arrange.

  4. Apartments with a board and a managing agent

    38.9% of Brooklyn housing units sit in buildings of 20 or more apartments, and city tax-lot data counts about 83,100 residential units on lots classed as co-ops. In those buildings the alteration agreement and house rules can decide underlayment, rug coverage, work hours and how material reaches the apartment, and each building writes its own. DOB names resurfacing floors as an example of work exempt from a permit. When a wider apartment project does need a filing, the owner attests to the board's authorization, and from February 2, 2026 a representative of the board has to confirm it in DOB NOW as well.

Cost factors

What moves the cost of a Brooklyn flooring job

In older Brooklyn buildings, the floor you see is rarely the whole story. These items usually account for the difference between one proposal and the next:

  • Layers underneath. How many floors are stacked in the room, and whether any of them need identification before they come out.
  • The board subfloor. Re-fastening loose boards, replacing damaged ones or adding plywood where the product's rules require more thickness.
  • Radiators and saddles. Cutting around each radiator or having it lifted, and replacing or keeping marble thresholds.
  • Stairs. Treads and nosings in a rowhouse stair take more time per square foot than open rooms.
  • Painted trim in older rentals. Whether HPD’s paint rules cover the trim changes what can be removed and by whom.
  • Getting material in and out. Walk-up stairs, building hours and protection of shared halls.

After the site visit we put each of these on its own line in the written proposal, so you can see what is driving the total. The method in how to compare remodeling estimates helps when you hold more than one proposal.

First conversation

What happens after you call about Brooklyn floors

  1. The call. We ask about the building (rowhouse, small multi-unit building or apartment), the rooms, what you can see at the doorways and registers, and whether there are tenants or a board.
  2. The site visit. We open an edge, check the subfloor boards and the joist direction, and mark radiators, saddles and height changes.
  3. The written scope. Product, underlayment, layers to remove, subfloor work and each transition are listed room by room.
  4. The written proposal. The cost and timing for that scope, plus any building approval, testing step or tenant coordination shown on the schedule.

A floor plan sketch with the rooms marked is enough to start; it does not need to be to scale.

Replacing floors in a Brooklyn rowhouse or apartment?

Send the address, a photo of each room and one of the floor at a doorway or register where the layers show. We check the building type and its rules before we come out.

Local evidence

Brooklyn floors in the city's own data

Brooklyn housing facts behind a flooring plan (Census ACS 2024 1-year; co-op figures from PLUTO 26v3)
MeasureBrooklynWhat it means underfoot
Housing units built 1939 or earlier48.4%Board subfloors and several generations of flooring
Housing units in two- to four-unit buildingsAbout 32%New floors above or below another household
Housing units in buildings of 20 or more apartments38.9%Board and managing-agent rules on the work
Homes on tax lots classed as co-opsAbout 83,100 units (7.4%)Approval comes before the product order

Brooklyn co-ops tend to be smaller buildings. Its co-op-classed units sit on 1,913 tax lots, an average of about 43 residential units per lot, against about 118 per lot in Queens. About 35% of Brooklyn's co-op units are on lots whose recorded construction year is before 1940; PLUTO construction dates are dependable to the decade only. In a walk-up co-op without an elevator, material and debris go up and down the stairs, which is part of the labor.

Garden-level and basement floors. Of 156,089 one- and two-family tax lots in Brooklyn, 16,896 (10.8%) are flagged on FEMA's 2015 preliminary map, against 3,483 on the 2007 effective map that the city's flood insurance rates are still based on. A flag means part of the lot lies in the 1% annual chance floodplain, not necessarily the house. Solid hardwood is a poor match there: one maker approves its solid floors only above or on grade.

  • Permits: most construction in New York City, Brooklyn included, needs approval and permits from the NYC Department of Buildings.
  • Rental buildings from before 1960: Local Law 1 of 2004 is administered through HPD, whose lead-based paint page sets out what owners must do.
The neighborhood pages for Park Slope, Bay Ridge, Flatbush and Gerritsen Beach describe the housing in those parts of the borough.

Planning a flooring project in Brooklyn? Call or email us to talk it through and arrange a consultation.

Call MMA Construction (516) 212-9311 Request a consultation

Questions

Flooring in Brooklyn: questions

Do the radiators have to come out for a new floor?
Not always. The floor can be cut neatly around a radiator's feet and pipes, which is quicker but leaves the old floor beneath the unit. Lifting the radiator lets the new floor run under it, but it means a plumber, a drained or isolated heating loop and a reconnection, so we schedule it outside the heating season where possible. In a building with other apartments, shutting down the heat affects them as well, which we plan with you.
Our building dates from before 1960 and has tenants. Does that change the trim work?
It can. Under Local Law 1 of 2004, as HPD describes it, paint in a pre-1960 building with tenants is presumed to be lead-based, and work that disturbs paint of unknown lead content is done by certified contractors using safe work practices, so painted baseboard, shoe molding and casings are treated with that in mind. We point out the painted trim a floor job would touch during the site visit, so you can check what applies to your building before the work is scheduled. Your own obligations as an owner are set out on HPD's lead-based paint page.
Can vinyl plank go straight over the old floor in our garden apartment?
It depends on what the old floor is and where it sits. One vinyl maker rules out installing over existing resilient tile that is below grade, asks for a moisture test on any concrete, with the adhesive deciding what reading is acceptable, and says not to sand or scrape old resilient flooring. Garden apartments often sit partly below the sidewalk, so we test the slab and have any old tile identified, then choose between covering it, removal by the right professional or a different product.
Can we stay in the apartment while the floors are replaced?
Usually, if the rooms are done in sections. Furniture moves to rooms not being worked on, a clear path stays open to the kitchen and bathroom, and adhesives, finishes and grout get the time they need before a room is used again. In a co-op or condo, the building's work hours and elevator bookings set the pace. Living at home during a renovation covers the day-to-day side.

Sources

  1. B25024 Units in Structure, Kings County (Brooklyn), ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-28.
  2. B25034 Year Structure Built, Kings County (Brooklyn), ACS 2024 1-year estimates, U.S. Census Bureau via Census Reporter (2025 (ACS 2024 1-year release)). Accessed 2026-11-28.
  3. Primary Land Use Tax Lot Output (PLUTO), version 26v3 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v3 (rows updated 2026-11-23)). Accessed 2026-11-28.
  4. PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-28.
  5. Building Classifications, NYC Department of Finance. Accessed 2026-11-28.
  6. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-28.
  7. DOB NOW: Build - Frequently Asked Questions (Other FAQs), NYC Department of Buildings. Accessed 2026-11-28.
  8. Service Notice: Condo/Co-Op Board Added as a Stakeholder in DOB NOW: Build, NYC Department of Buildings (2026-01-08). Accessed 2026-11-28.
  9. Lead-Based Paint, NYC Department of Housing Preservation and Development. Accessed 2026-11-28.
  10. NYC Flood Maps, City of New York. Accessed 2026-11-28.
  11. Somerset Solid Hardwood Flooring Installation Guidelines, Somerset Hardwood Flooring (manufacturer). Accessed 2026-11-28.
  12. Mosaic Luxury Vinyl Installation Instructions (v.2-25), Mosaic Tile Company (manufacturer) (v.2-25). Accessed 2026-11-28.

Talk to us about your flooring project in Brooklyn

Call or email us to talk it through and arrange a consultation.

CallRequest a Consultation