MMA ConstructionConstruction & Remodeling Call MMA Construction

Whole-home renovation · Flushing, Queens

Home renovation for Flushing houses and apartments

NYC Licensed Home Improvement Contractor License #2139648-DCWP

MMA Construction & Remodeling plans multi-room renovations in Flushing, Queens. City tax-lot records put one- and two-family houses on most residential lots in East Flushing and Murray Hill-Broadway Flushing, while the area around downtown is mostly condo, co-op and rental buildings. We plan the rooms as one sequence, systems before finishes, and write the scope down first.

  • Two-family houses renovated floor by floor around the other unit
  • Pre-1940 houses: wiring, pipes and walls planned before the finishes
  • Condo and co-op apartments sequenced under the building's own rules
Living room with a dark accent wall, light oak floor and black-framed windows

Scope

What a Flushing home renovation can include

The work stays inside the home and is written as one scope, so walls open once for the trades and close once for the finishes.

  • Kitchen and bathroom remodels planned inside the wider sequence
  • Plaster and drywall repair, ceilings, interior doors and trim
  • New circuits and electrical upgrades by a licensed electrician, under their own permit
  • Plumbing and gas changes by a Licensed Master Plumber, as DOB requires
  • Flooring carried across connected rooms, then interior painting
  • Phasing in a two-family house so one unit stays livable
  • Not included: structural work, additions, exterior work or new units

Process

How MMA Construction & Remodeling runs a whole-home renovation project

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Queens

Whole-home planning points for Flushing

  1. Three different housing markets under one name

    City planners split Flushing into several neighborhood tabulation areas, and their housing differs sharply. In Flushing-Willets Point, which takes in downtown, only 467 of 1,548 residential lots hold one- or two-family houses, and condo units make up about a third of homes, most in buildings from 2000 or later. In Murray Hill-Broadway Flushing and East Flushing, more than eight lots in ten hold one- or two-family houses. A whole-apartment project in a newer condo is a run of rooms under building rules; a house project usually reaches the wiring, pipes and walls too.

  2. Two-family houses are common in East Flushing

    PLUTO classes 1,924 of East Flushing's 4,675 lots with homes as two-family, about 41%, and 591 of those as two-family houses converted from one-family. Across the three areas there are 3,784 two-family lots. Renovating one floor while someone lives upstairs or downstairs is common, and the units can be tied together by one water service, a gas line, the electrical service or a shared drain stack. We map the shared lines first, agree shutoffs in writing, and keep dust and deliveries away from the occupied unit.

  3. Older houses: systems before surfaces

    In East Flushing, half of the lots with a recorded year predate 1940, and across the three areas 85% predate 1978. In a house of that age, a whole-home plan settles the wiring, supply piping and drains first, then the walls, then floors and paint. New York City requires a separate electrical permit and a licensed electrician for electrical work, and a Licensed Master Plumber for plumbing and gas work. In a one- or two-family house, anything beyond DOB's exempt list goes ahead only after a registered design professional files plans.

  4. Rented units, older paint and asbestos

    Where part of the house is rented out and the building dates from before 1960, Local Law 1 has the owner treat the paint in that apartment as presumed lead-based. For paid work that disturbs paint in housing from before 1978, EPA requires certified firms and lead-safe practices. Under DEP rules, the owner also arranges an asbestos survey by an investigator DEP has certified, to find out if the planned work could disturb asbestos. Settle these points before walls open; the proposal shows where each one applies to your scope.

Decisions

One project or phases in a Flushing house

A multi-room renovation can run as one continuous project or in planned phases. The house and the household usually decide:

  • One continuous project suits a house that is empty or a household that can stay elsewhere: systems are run once, rooms are finished together, and the overall schedule is shortest.
  • Floor-by-floor phases suit a two-family house with someone living on the other floor, or a family staying at home: each phase is closed off, finished and handed back before the next begins.
  • Systems now, finishes later suits a staged budget: wiring, plumbing and walls are done in one pass, and kitchen or bath finishes follow in a later phase that does not reopen them.

Material choices follow the phase plan. Wood, engineered wood and vinyl plank floors are easiest to match when they go down across connected rooms at the same time, and interior paint is usually the last trade. Whole-home renovation: what first covers the order in more depth.

Cost factors

What affects the cost of a Flushing home renovation

A multi-room project is priced from its written scope. These are the factors that move it most in Flushing homes:

  • How many rooms open to the framing. Cosmetic rooms and rooms opened for new wiring or pipes are separate lines in the scope.
  • System condition. Original wiring, galvanized supply pipe or old drains change the trade work in an older house.
  • Kitchen and bath count. In a two-family house, doing both units' kitchens and baths doubles the most trade-heavy rooms.
  • Design and filing. Work beyond DOB's exempt list is drawn and submitted by a registered design professional, which is its own line in the scope.
  • Occupied units. Phasing around a lived-in floor adds protection, cleanup and extra mobilizations.
  • Survey findings. Asbestos survey results and any lead-safe work by certified firms are separate items when they apply.
  • Selections. Flooring, tile, cabinets and fixtures across several rooms add up; allowances should state what they cover.

Schedule factors

What affects the schedule of a Flushing home renovation

  • Plans and permits. On filed work, design, DOB approval and permits come before the walls open.
  • Phasing. A floor-by-floor plan runs longer overall than one continuous project but keeps part of the house usable.
  • Rough-in inspections. Wiring and piping are inspected while they are still exposed, before any wall is closed.
  • Building rules. In condos and co-ops, approvals, elevator bookings and the hours a building permits set the pace.
  • City work hours. Weekday work runs within the 7 a.m. to 6 p.m. window DEP sets; evenings and weekends need its after-hours authorization.
  • Long-lead items. Cabinets, special-order doors and tile can set the finish date.

Planning several rooms in Flushing?

Send the room list, the type of home and who will live there during the work. We plan the site visit around it and write the scope and sequence before work starts.

Local evidence

Flushing housing records, landmarks and flood flags for a renovation

Lots with homes in three Flushing NTAs (DCP PLUTO 26v3 downloaded 2026-11-28; DOF building classes)
MeasureFlushing-Willets PointMurray Hill-Broadway FlushingEast Flushing
Tax lots with homes1,5487,3054,675
One-family lots (class A)1384,5612,082
Two-family lots (class B)3291,5311,924
Three-family lots (class C0)314708365
Share of homes in condo or co-op lots51.7%29.4%10.4%
Lots dated before 1978912 of 1,5486,733 of 7,3043,887 of 4,671

PLUTO records a full basement on 10,342 of the 10,565 one- and two-family lots across the three NTAs, and the data dictionary notes that year built is generally right to the decade. No lot in any of them falls in an LPC historic district. LPC lists nine individual landmark sites in Flushing-Willets Point and two in Murray Hill-Broadway Flushing, among them Bowne House, Flushing Town Hall and the Lewis H. Latimer House, and none of those lots holds a home in PLUTO. The Flushing planning notes list all eleven.

  • Flood flags: in Flushing-Willets Point, 98 lots with homes carry a flag on the 2007 effective FEMA map and 22 on the preliminary 2015 one; Murray Hill-Broadway Flushing has 3 and 2, East Flushing none. A flag means part of the lot is mapped, not necessarily the house. City flood insurance rates still follow the 2007 maps, and an address search on FEMA's Flood Map Service Center shows the current ones.
  • Permit type: DOB's ALT2 application covers renovations with several kinds of work that do not change a building's use, exits or occupancy, and most kitchen and bathroom renovations need one, filed by an engineer or architect.
  • Condos and co-ops: DOB's service notice says that, starting February 2, 2026, the board appears as a stakeholder on DOB NOW filings made by condo unit owners or co-op shareholders and must attest that it authorized them.
DCP builds NTAs from census tracts and cautions that the names and lines may not track the neighborhood as residents know it. The scope for your home is written from your own address and its records.

Planning a whole-home renovation in Flushing? Call or email us to talk it through and arrange a consultation.

Call MMA Construction (516) 212-9311 Request a consultation

Questions

Whole-home renovation in Flushing: questions

Which rooms should we renovate first in an older Flushing house?
Usually the rooms whose pipes and wiring serve the rest of the house. That often means the kitchen and bathrooms, because their supply, drain and electrical runs pass through other rooms' walls and ceilings. Doing them first, or at least running their new lines first, avoids cutting into a finished room later. Bedrooms and living areas follow, with flooring and paint last. We set the order in the written scope after seeing the basement and the existing runs.
Our Flushing condo is in a newer building. Does a whole-apartment renovation still need approvals?
Almost always from the building, and sometimes from the city. Condominium buildings set their own rules for contractors, hours, deliveries and what may change inside a unit. Where a DOB filing is needed, the condo board now has to confirm in DOB NOW that it authorized the applicant. Like-for-like finish work may need no permit. Once we have read the building's rules, the written proposal identifies what your scope needs.
Our house was converted from a one-family. Does that change the renovation?
It can. PLUTO classes more than 1,100 two-family houses in these three Flushing NTAs as converted from one-family. Where a house was converted, the second unit's kitchen, bath and wiring may date from a later change and may not follow the original layout. Before planning, pull the Certificate of Occupancy and the DOB permit history for the address. Changing a building's legal use or number of units is outside our scope, so the renovation is planned within what is already approved.
Does the flood map matter for a Flushing renovation?
For most houses here it does not. Among lots with homes, PLUTO's flood-map flags are concentrated in Flushing-Willets Point, and East Flushing has none. If your lot is flagged, the basement and ground floor deserve a closer look before finishes are chosen, and a design professional can explain what the mapped floodplain means for the work. Start by searching the address on FEMA's Flood Map Service Center.

Sources

  1. Primary Land Use Tax Lot Output (PLUTO), version 26v3 (dataset 64uk-42ks), NYC Department of City Planning via NYC Open Data (26v3 (rows updated 2026-11-23)). Accessed 2026-11-28.
  2. PLUTO Data Dictionary (23v1.1), NYC Department of City Planning (2023-05). Accessed 2026-11-28.
  3. 2020 Census Tracts to 2020 NTAs and CDTAs Equivalency (dataset hm78-6dwm), NYC Department of City Planning via NYC Open Data (2021-09-20). Accessed 2026-11-28.
  4. The Newest New Yorkers 2026, Chapter 1, NYC Department of City Planning (2026). Accessed 2026-11-28.
  5. NYC Building Classifications, NYC Department of Finance. Accessed 2026-11-28.
  6. Historic Districts (dataset skyk-mpzq), NYC Landmarks Preservation Commission via NYC Open Data (rows updated 2026-06-18). Accessed 2026-11-28.
  7. Individual Landmark Sites (dataset buis-pvji), NYC Landmarks Preservation Commission via NYC Open Data (rows updated 2026-06-30). Accessed 2026-11-28.
  8. NYC Flood Maps, City of New York. Accessed 2026-11-28.
  9. FEMA Flood Map Service Center, Federal Emergency Management Agency. Accessed 2026-11-28.
  10. Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-28.
  11. Project Requirements for Owner: 1- and 2-Family Buildings, NYC Department of Buildings. Accessed 2026-11-28.
  12. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-28.
  13. Service Notice: Condo/Co-Op Board Added as a Stakeholder in DOB NOW: Build, NYC Department of Buildings (2026-01-08). Accessed 2026-11-28.
  14. Lead-Based Paint, NYC Department of Housing Preservation and Development. Accessed 2026-11-28.
  15. Lead Renovation, Repair and Painting Program Rules, U.S. Environmental Protection Agency. Accessed 2026-11-28.
  16. Asbestos Abatement, NYC Department of Environmental Protection. Accessed 2026-11-28.
  17. Construction Noise Rules & Regulations, NYC Department of Environmental Protection. Accessed 2026-11-28.

Talk to us about your renovation project in Flushing

Call or email us to talk it through and arrange a consultation.

CallRequest a Consultation