MMA ConstructionConstruction & Remodeling Call MMA Construction

Planning guide

Before you renovate in NYC: check the house's permits, Certificate of Occupancy and violations

What the records hold for a house can decide what a new filing needs, so look before anything is designed.

Updated 2026-11-20 · General information, not legal or engineering advice.

Short answer

In New York City, a house's building records sit in two DOB systems: BIS and the DOB NOW Public Portal. Check both for the Certificate of Occupancy, permits, complaints and violations before a renovation is designed. Earlier unpermitted work matters most: DOB requires its penalty to be paid before it issues a permit for new work in that space.

Who it is for
Owners and buyers of one- and two-family houses in Queens, Brooklyn, the Bronx and Staten Island
What it covers
Kitchen, bathroom, basement and whole-home renovations that may need a DOB permit
When to read it
Before design, before a purchase contract is final, and before a contractor is hired

Where NYC keeps a house's records

With the Building Information System (BIS) and the DOB NOW Public Portal, you can review the history of any building in New York City, including violations, permits and complaints, and whether each one is active or resolved. BIS holds the records of permits issued and job applications created before DOB NOW launched. The DOB NOW Public Portal can be searched without an account, by address, borough-block-lot or BIN, to see the filings for a property. Check both systems, because an older job and a newer one for the same house can sit in different places.

What to look for, and where
RecordWhere to lookWhy it matters before a renovation
Certificate of OccupancyBIS for a CO issued before March 1, 2021; DOB NOW for one issued on or after that dateThe legal use and occupancy the new work has to respect
Permits and job filingsBIS for older jobs and the DOB NOW Public Portal for newer onesAn open or expired permit from earlier work may have to be dealt with first
Complaints and violationsThe BIS property profile, plus HPD Online for housing-code recordsOpen items can hold up a sign-off or a new or amended CO

Which system to search first: what the filing data shows

To see where a house's records are likely to sit, MMA Construction & Remodeling counted the alteration filings for one- to three-family buildings in the Department of Buildings' public data, year by year. Until 2017, almost all of them were filed in BIS. 2021 was the first year most were filed in DOB NOW, and in 2025 about 95% were. For work done before 2021, start with BIS; for newer work, start with DOB NOW. Search both either way: DOB says jobs filed in DOB NOW: Build do not appear in BIS, and its Public Portal shows only DOB NOW filings.

Alteration filings for NYC one- to three-family buildings, by DOB system, 2016 to 2025 (an MMA Construction & Remodeling analysis of NYC Department of Buildings public filing data, retrieved November 20, 2026)
YearBIS: alteration jobsDOB NOW: initial alteration filingsShare filed in DOB NOW
201618,98500.0%
201718,3241720.9%
201818,3251,7898.9%
201916,7775,11023.3%
202013,8648,95439.2%
20218,26116,91667.2%
202210,83315,39258.7%
202310,58012,76054.7%
20241,05219,63294.9%
20251,06918,98594.7%

Read the table as a guide to where to look, not as a count of renovations. The two systems count differently (BIS by job, DOB NOW by initial filing), the building type is self-reported on the filing, and a filing is not a finished project. Solar work also entered the DOB NOW data mainly from 2024: in 2025, about 45% of the initial DOB NOW alteration filings for these buildings were for solar work alone. Leaving those out, the 2025 DOB NOW share is still above 90%.

Which DOB and HPD systems show what (from the agencies' own pages and FAQs)
SystemWhat it showsKeep in mind
BIS (Building Information System)Permits and job applications from before DOB NOW, Certificates of Occupancy issued before March 1, 2021, DOB complaints and violations, including OATH/ECB violationsJobs filed in DOB NOW: Build do not appear in BIS
DOB NOW Public PortalDOB NOW filings, including Limited Alteration Applications, and Certificates of Occupancy issued on or after March 1, 2021; searchable without an account by address, borough-block-lot or BINShows only DOB NOW filings; complaints and OATH/ECB violations are in BIS
DOB records requestOlder paper records: folders, plans, microfilm, docket books, reels, index cards and curb cut cardsRequested from DOB rather than searched online
HPD OnlineHousing-code complaints and violations, property registration, charges and litigation, and vacate ordersHousing-code records, kept apart from DOB filings

Smaller jobs can sit in a third place. A Limited Alteration Application (LAA) is a DOB NOW filing used for plumbing work, fire suppression piping repairs and replacement, and oil burner installations that do not include construction work. In 2025, DOB NOW recorded 4,652 distinct LAA jobs for one- to three-family buildings in the city. Electrical permits are published separately again, so a complete history can mean several searches.

How these figures were made: analysis by MMA Construction & Remodeling using NYC Department of Buildings open data (DOB Job Application Filings for BIS, DOB NOW: Build Job Application Filings, and DOB NOW: Build Limited Alteration Applications), downloaded as aggregate counts on November 20, 2026. BIS counts distinct A1, A2 and A3 alteration jobs; DOB NOW counts initial Alteration and Alteration CO filings for 1, 2 and 3 Family buildings; LAA jobs are distinct job numbers for the year. The figures were reproduced independently from the same public sources before publication. The datasets update daily, so a new query can differ slightly.

Find the Certificate of Occupancy, or why there isn't one

A Certificate of Occupancy (CO) states the legal use and/or type of permitted occupancy of a building, and an existing building needs a current or amended CO when there is a change in use, egress or type of occupancy. For a CO issued before March 1, 2021, DOB points to View Certificates of Occupancy in BIS; for one issued on or after that date, to the property search in DOB NOW. A Certificate of Occupancy has no expiration date.

Many older houses have no CO at all. For a building built or altered before 1938, when a CO was not required, DOB may issue a Letter of No Objection to confirm the legal use of the building. The letter is requested from the DOB borough office, and it is issued if the use complies with the building code and zoning and the occupancy load and exits of the building are unchanged.

That 1938 line covers a large share of the city's houses. In an MMA Construction & Remodeling analysis of NYC Department of City Planning PLUTO data, about 51% of one- to three-family tax lots with a known build year have a building recorded as built before 1938. Because PLUTO's year built is accurate to the decade, not the exact year, the share of these lots with a building recorded before 1938 could be anywhere from about 47% to 57%. By borough it runs from about 20% on Staten Island to about 71% in Brooklyn.

One- to three-family tax lots with a building recorded as built before 1938 (MMA Construction & Remodeling analysis of NYC Department of City Planning PLUTO 26v2 data)
AreaLots with a known build yearRecorded before 1938Range if build years are rounded
The Bronx61,96746%42% to 51%
Brooklyn190,22071%68% to 75%
Manhattan5,59992%92% to 92%
Queens270,87650%45% to 59%
Staten Island109,17520%18% to 22%
New York City637,83751%47% to 57%

A build year in PLUTO is not a ruling on a house's paperwork. A building from before 1938 may still have a Certificate of Occupancy if later alterations changed its use, egress or occupancy, and PLUTO counts tax lots, not buildings. The lots counted are those with a one-family, two-family or three-family building class (A, B or C0); lots with no recorded year are left out. DOB answers the question for a specific address.

A records search shows what was filed; whether a particular room or use is legal is answered by DOB for the specific address, not by a listing or a seller's description.

Open or expired permits left by earlier work

DOB renews active permits and permits that have expired but have activity on the application within a two-year period of the permit expiration date. To replace the contractor on a permit that is still active, DOB requires a superseding letter, authorized by the owner, so the new contractor replaces the previous one on record. Permits issued in DOB NOW: Build expire at the earliest of the insurance expiration, the license expiration, or one year from issuance.

DOB's permit pages do not set out what happens to a permit that expired more than two years ago, so ask the design professional or DOB how that job should be handled before new work is filed. If work continued after a permit expired, DOB's penalty rule treats it as work without a permit: for a one- or two-family house the penalty is $600, and it must be paid before that permit is renewed.

Work done earlier without a permit

This is the item most likely to hold up a new filing. Under DOB's rule on civil penalties for work without a permit (1 RCNY §102-04), the penalty for unpermitted work in a space must be paid before DOB issues a permit for new work in that space. For a one- or two-family house, the rule sets that penalty at the greater of six times the current permit fee, but not more than $10,000, or $600. The same one- and two-family amount applies to work inside a residential co-op or condo unit. For apartments, our co-op and condo approvals guide covers the building side.

DOB's work-without-permit penalty in numbers (1 RCNY §102-04 as posted by DOB; amounts depend on your permit fee, so confirm with DOB)
BuildingPenaltyThe $ minimum applies while the permit fee is at or belowThe cap is reached at a permit fee of
One- or two-family house, including inside a co-op or condo unitThe greater of 6 × the permit fee (at most $10,000) or $600$100$1,666.67
Any other building, including co-op or condo common areasThe greater of 21 × the permit fee (at most $15,000) or $6,000$285.71$714.29

Where only part of the work was done without a permit, DOB reduces the penalty in proportion, within the same minimum and cap. The penalty is based on the occupancy shown on the Certificate of Occupancy or other DOB records, which is one more reason to read the CO first.

If a permit is sought for completed unpermitted work before a notice of violation is issued, the rule sets the penalty for a one- or two-family house at $600, and removing the unpermitted work also carries a $600 penalty. The copy of the rule that DOB posts is a file dated October 2024, so confirm the current amounts with DOB before relying on them.

Complaints and violations

Open DOB complaints and violations appear on the BIS property profile. For housing-code matters, HPD Online shows information that may include complaints and violations, property registration, charges and litigation, block and lot information and vacate orders. A CO cannot be obtained while open applications or violations remain, so if your project needs a new or amended CO, an open item from earlier work becomes part of your project.

What to do with what you find

  • Everything is closed and matches the house: design can start, with copies of what you found kept for the filing.
  • An open or expired permit from earlier work: ask the design professional whether it should be renewed, superseded or closed before the new filing.
  • A finished room or other work that does not appear in the records: raise it before design, because the penalty rule above applies to that space.
  • You are buying the house: take these questions to your attorney before the contract is final.
This guide explains where to look and what the records can mean for a filing; it is not a legal opinion about any address. Whether your own scope needs a permit is a separate question. Our NYC vs. Suffolk permits guide covers who issues permits and for what.

Closing out your own renovation

DOB reminds owners that project work does not end when the contractor completes the physical work. A Letter of Completion may be issued for minor alterations that do not need a new or amended CO, once all the permits on the filing are signed off. A closed file is what the next owner's records search should find.

In Suffolk County the records are kept by each town or village instead. Our Suffolk finished-basement guide lists where to search there.

If the house is in Queens, home remodeling in Queens covers the local checks that come next.

Planning aid

NYC records pre-check

  • I searched BIS by borough and address and noted the BIN.
  • I searched the DOB NOW Public Portal for the same address.
  • I found the Certificate of Occupancy, or confirmed the house predates 1938 and checked for a Letter of No Objection.
  • Every permit from earlier jobs is signed off, or I know which ones are open or expired.
  • I checked open DOB complaints and violations, and HPD Online if a unit is rented.
  • Any finished space that does not appear in the records has been raised with the design professional.
  • I saved copies of what I found, with the date I checked.

Sources

  1. Get Building History, NYC Department of Buildings. Accessed 2026-11-19.
  2. DOB NOW Public Portal user manual, NYC Department of Buildings (as of 2022-11-04). Accessed 2026-11-19.
  3. Certificate of Occupancy, NYC Department of Buildings. Accessed 2026-11-19.
  4. Letter of No Objection or Completion, NYC Department of Buildings. Accessed 2026-11-19.
  5. Renewing Permits, NYC Department of Buildings. Accessed 2026-11-19.
  6. Permit Renewal, NYC Department of Buildings. Accessed 2026-11-19.
  7. 1 RCNY §102-04, Civil penalties for work without a permit and for violation of stop work orders, NYC Department of Buildings (DOB-posted file dated 2024-10-24). Accessed 2026-11-19.
  8. HPD Online, NYC Department of Housing Preservation and Development. Accessed 2026-11-19.
  9. Primary Land Use Tax Lot Output (PLUTO), NYC Department of City Planning, NYC Open Data (version 26v2). Accessed 2026-11-20.
  10. DOB Job Application Filings, NYC Department of Buildings, NYC Open Data. Accessed 2026-11-20.
  11. DOB NOW: Build – Job Application Filings, NYC Department of Buildings, NYC Open Data. Accessed 2026-11-20.
  12. DOB NOW: Build – Limited Alteration Applications, NYC Department of Buildings, NYC Open Data. Accessed 2026-11-20.
  13. DOB NOW: Build FAQs, NYC Department of Buildings. Accessed 2026-11-20.
  14. DOB NOW Public Portal FAQs, NYC Department of Buildings. Accessed 2026-11-20.
  15. Find Building Data, NYC Department of Buildings. Accessed 2026-11-20.

Planning a renovation in a NYC house?

Send the address and what you plan to change. We start with the records and the permit route before a layout is drawn.

CallRequest a Consultation