Tub-to-shower conversion
Tub-to-shower conversion in New York City
NYC Licensed Home Improvement Contractor License #2139648-DCWP
Taking out a bathtub and building a walk-in shower in the same footprint looks like one change. In practice it is four decisions: the shower base and walls, the drain and valve, the waterproofing behind the finish, and the glass. In New York City, the plumbing rules and, in a co-op or condo, the building's alteration rules shape all four.

Scope
What the work can include
Every project is scoped individually. This is what is typically part of the work, not a package.
- Removing the tub and the wall finish around it, down to a sound substrate
- A new shower floor: a prefabricated base, or a sloped mortar bed under tile
- A continuous waterproofing membrane on the shower walls and floor, tied into the drain
- Drain and valve changes planned with the plumbing work they require
- Wall finish: tile, or a panel system matched to the base
- A glass door, fixed panel or curtain, measured after the walls are finished
- The exhaust fan reviewed as part of the same scope
New York homes
What is different here
Plumbing work has its own rules
NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber. Keeping the drain and valve close to where they are keeps the plumbing part of the job small; moving them makes it larger.
Apartments add a second approval
In a co-op or condo, the alteration agreement usually treats a shower conversion as wet work, so the building reviews the plan, and its rules on working hours, protection of the unit below and paperwork become part of the schedule.
Older bathrooms hide surprises
Behind old tile in many city bathrooms there is a mortar bed, old supply lines or past leak damage. These usually show only after demolition, so the written proposal should say how they are addressed.
Scope
What the conversion includes
| Part of the job | Shower insert or panel system | Custom tile shower |
|---|---|---|
| Floor | A prefabricated base sized to the opening | A sloped mortar bed or pre-sloped tray under tile |
| Walls | Panels set over a prepared wall | Tile over a waterproofed backer board or membrane |
| Waterproofing | Seams, base flange and fixture openings sealed as the system requires | A continuous membrane on walls and floor, tied into the drain |
| Layout freedom | Limited to the sizes the system comes in | Niches, benches and tile layout planned to the room |
| What to ask | Which system, and how its seams and base are sealed | Which membrane, where it stops on the walls, and whether the floor is flood-tested before tile |
- Drain: a tub drain usually sits at one end. A shower drain may stay, move toward the center, or become a linear drain along one wall, and each option changes the plumbing and the floor slope.
- Valve: a tub filler and shower head are usually replaced with a shower valve, often with a handheld head. Where the valve and controls sit is worth deciding before the wall is closed.
- Waterproofing membrane: tile and grout are not waterproof on their own. Sheet membranes, liquid-applied membranes and mortar beds with a liner all work when installed to the manufacturer's instructions.
- Glass: a hinged door, a sliding door, a fixed panel or a curtain. The choice is made together with the entry and the curb, and glass is usually measured after tile is finished.
Material and layout choices are covered in bathroom materials and layout, and the full planning sequence in the tub-to-shower conversion guide.
Drivers, not prices
What drives the cost
Two conversions in bathrooms of the same size can be priced very differently. The difference usually comes from a short list of choices and conditions, most of them known after the site visit.
- Insert or tile. A panel system and a custom tile shower involve different materials and very different amounts of labor.
- Drain and valve location. Keeping both where they are is the simplest plan; moving the drain, adding a linear drain or relocating the valve adds plumbing work.
- The entry. A standard curb, a low curb and a curbless floor each need a different floor build-up and slope.
- Tile area and detail. Full-height tile, large-format or patterned tile, niches and benches add labor beyond the square footage.
- The glass. A curtain, a framed door and a fixed or frameless panel sit at very different points.
- What demolition uncovers. A soft subfloor, old supply lines or past leak damage behind the tub show only once it is out, so the proposal should say how they are priced.
- The building. In a co-op or condo, required working hours, protection of halls and elevators, and the approval paperwork become part of the schedule and the price.
A conversion is priced from a written scope after the site visit, so each of these points is settled in writing before you compare numbers. The bathroom remodel cost factors guide covers them in more detail.
Before demolition
Approvals: DOB rules and building rules
NYC Department of Buildings. DOB lists plumbing fixture replacement among examples of minor work that may not need a permit. Moving the drain, relocating the valve or adding fixtures goes beyond swapping a fixture. NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber. If the scope requires plans and permits, DOB says a New York State licensed professional engineer or registered architect must be hired, and most kitchen and bathroom renovations that need plans are filed as an ALT2 application by a PE or RA.
Co-ops and condos. The building's alteration agreement is a private approval and is separate from any DOB permit. Many agreements ask for plans, the contractor's insurance certificates, set working hours and limit where wet areas may go. Since February 2, 2026, when the owner type on a DOB NOW filing is Condo Unit Owner or Co-Op Tenant-Shareholder, the condo or co-op board is a stakeholder on the filing, and "the Board's representative will be required to attest that the Board has authorized the applicant to file the application."
Process
How MMA Construction & Remodeling runs a tub-to-shower conversion project
Written scope, written proposal, permits identified up front, and one project lead from start to finish.
Conversation
You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.
Site visit and scope
We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.
Design and selections
Layout, materials and fixtures are agreed in writing before work is priced in full.
Written proposal
A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.
Build
One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.
Walkthrough
We review the finished work with you and resolve anything outstanding.
Questions
Tub-to-shower conversion: common questions
Do I need a permit for a tub-to-shower conversion in NYC?
Can a tub-to-shower conversion be curbless?
How long does a tub-to-shower conversion take?
Planning guides
Read before you plan
- Tub-to-shower conversion: what to plan before the tub comes out Swapping a tub for a shower looks like one change. It is really four decisions: the entry, the waterproofing, the plumbing and who has to approve it.
- How long a bathroom remodel takes: the phases and where they slip The days of demolition and tile are the predictable part. The schedule is usually decided earlier, by selections, ordering and approvals.
- Bathroom materials and layout: planning for water, air and access Good bathrooms are planned from the wettest spot outward: what gets soaked, how moisture leaves the room, and who needs to use it.
- Bathroom remodel cost in New York City: what drives it The biggest swings usually come from what happens to the plumbing and the shower, not from the tile you pick.
Sources
- Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-28.
- Project Requirements for Owner: Plumbing, NYC Department of Buildings. Accessed 2026-11-28.
- Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-28.
- Service Notice: Condo/Co-Op Board Added as a Stakeholder in DOB NOW: Build (January 8, 2026), NYC Department of Buildings. Accessed 2026-11-28.
Planning a tub-to-shower conversion in New York City?
Call or email us to talk it through and arrange a consultation.