Tub-to-shower conversion

Tub-to-shower conversion in New York City

NYC Licensed Home Improvement Contractor License #2139648-DCWP

Taking out a bathtub and building a walk-in shower in the same footprint looks like one change. In practice it is four decisions: the shower base and walls, the drain and valve, the waterproofing behind the finish, and the glass. In New York City, the plumbing rules and, in a co-op or condo, the building's alteration rules shape all four.

Dark square floor tile laid around a linear shower drain before the walls are finished

Scope

What the work can include

Every project is scoped individually. This is what is typically part of the work, not a package.

  • Removing the tub and the wall finish around it, down to a sound substrate
  • A new shower floor: a prefabricated base, or a sloped mortar bed under tile
  • A continuous waterproofing membrane on the shower walls and floor, tied into the drain
  • Drain and valve changes planned with the plumbing work they require
  • Wall finish: tile, or a panel system matched to the base
  • A glass door, fixed panel or curtain, measured after the walls are finished
  • The exhaust fan reviewed as part of the same scope

New York homes

What is different here

  1. Plumbing work has its own rules

    NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber. Keeping the drain and valve close to where they are keeps the plumbing part of the job small; moving them makes it larger.

  2. Apartments add a second approval

    In a co-op or condo, the alteration agreement usually treats a shower conversion as wet work, so the building reviews the plan, and its rules on working hours, protection of the unit below and paperwork become part of the schedule.

  3. Older bathrooms hide surprises

    Behind old tile in many city bathrooms there is a mortar bed, old supply lines or past leak damage. These usually show only after demolition, so the written proposal should say how they are addressed.

Scope

What the conversion includes

Two common ways to build the new shower (general guidance; the site visit decides)
Part of the jobShower insert or panel systemCustom tile shower
FloorA prefabricated base sized to the openingA sloped mortar bed or pre-sloped tray under tile
WallsPanels set over a prepared wallTile over a waterproofed backer board or membrane
WaterproofingSeams, base flange and fixture openings sealed as the system requiresA continuous membrane on walls and floor, tied into the drain
Layout freedomLimited to the sizes the system comes inNiches, benches and tile layout planned to the room
What to askWhich system, and how its seams and base are sealedWhich membrane, where it stops on the walls, and whether the floor is flood-tested before tile
  • Drain: a tub drain usually sits at one end. A shower drain may stay, move toward the center, or become a linear drain along one wall, and each option changes the plumbing and the floor slope.
  • Valve: a tub filler and shower head are usually replaced with a shower valve, often with a handheld head. Where the valve and controls sit is worth deciding before the wall is closed.
  • Waterproofing membrane: tile and grout are not waterproof on their own. Sheet membranes, liquid-applied membranes and mortar beds with a liner all work when installed to the manufacturer's instructions.
  • Glass: a hinged door, a sliding door, a fixed panel or a curtain. The choice is made together with the entry and the curb, and glass is usually measured after tile is finished.

Material and layout choices are covered in bathroom materials and layout, and the full planning sequence in the tub-to-shower conversion guide.

Drivers, not prices

What drives the cost

Two conversions in bathrooms of the same size can be priced very differently. The difference usually comes from a short list of choices and conditions, most of them known after the site visit.

  • Insert or tile. A panel system and a custom tile shower involve different materials and very different amounts of labor.
  • Drain and valve location. Keeping both where they are is the simplest plan; moving the drain, adding a linear drain or relocating the valve adds plumbing work.
  • The entry. A standard curb, a low curb and a curbless floor each need a different floor build-up and slope.
  • Tile area and detail. Full-height tile, large-format or patterned tile, niches and benches add labor beyond the square footage.
  • The glass. A curtain, a framed door and a fixed or frameless panel sit at very different points.
  • What demolition uncovers. A soft subfloor, old supply lines or past leak damage behind the tub show only once it is out, so the proposal should say how they are priced.
  • The building. In a co-op or condo, required working hours, protection of halls and elevators, and the approval paperwork become part of the schedule and the price.

A conversion is priced from a written scope after the site visit, so each of these points is settled in writing before you compare numbers. The bathroom remodel cost factors guide covers them in more detail.

Before demolition

Approvals: DOB rules and building rules

NYC Department of Buildings. DOB lists plumbing fixture replacement among examples of minor work that may not need a permit. Moving the drain, relocating the valve or adding fixtures goes beyond swapping a fixture. NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber. If the scope requires plans and permits, DOB says a New York State licensed professional engineer or registered architect must be hired, and most kitchen and bathroom renovations that need plans are filed as an ALT2 application by a PE or RA.

Co-ops and condos. The building's alteration agreement is a private approval and is separate from any DOB permit. Many agreements ask for plans, the contractor's insurance certificates, set working hours and limit where wet areas may go. Since February 2, 2026, when the owner type on a DOB NOW filing is Condo Unit Owner or Co-Op Tenant-Shareholder, the condo or co-op board is a stakeholder on the filing, and "the Board's representative will be required to attest that the Board has authorized the applicant to file the application."

Whether your conversion needs a permit, a filing or a building approval depends on the scope and the address. Those requirements are identified in the written proposal, before any work is scheduled.

Process

How MMA Construction & Remodeling runs a tub-to-shower conversion project

Written scope, written proposal, permits identified up front, and one project lead from start to finish.

  1. Conversation

    You describe the home and what you want to change. We ask about budget range and timing so expectations are clear early.

  2. Site visit and scope

    We look at the space, the structure of the house and any HOA, co-op or condo rules that apply, then write a scope of work.

  3. Design and selections

    Layout, materials and fixtures are agreed in writing before work is priced in full.

  4. Written proposal

    A written price and schedule for the agreed scope. Permits and any approvals are identified at this stage.

  5. Build

    One project lead coordinates the trades and keeps you updated. Some regulated work may require appropriately licensed specialty contractors.

  6. Walkthrough

    We review the finished work with you and resolve anything outstanding.

Questions

Tub-to-shower conversion: common questions

Do I need a permit for a tub-to-shower conversion in NYC?
It depends on the scope. DOB lists plumbing fixture replacement among examples of minor work that may not need a permit, but work that goes beyond replacing fixtures in kind — such as moving the drain, relocating the valve or adding fixtures — is no longer minor work and can require a DOB filing. NYC DOB states that the plumbing work it lists can only be performed by a Licensed Master Plumber. In a co-op or condo the building has its own approval as well. What your scope and address require is identified in the written proposal.
Can a tub-to-shower conversion be curbless?
Often, but the floor decides. A curbless shower needs enough slope to carry water to the drain without a lip, which usually means recessing the shower floor below the bathroom floor. In a house, recessing the floor between joists can mean cutting or altering framing, which is a structural alteration and outside the scope of this service at this stage. In an apartment, the slab, the unit below and the building's rules decide. A low curb or a linear drain is the usual alternative.
How long does a tub-to-shower conversion take?
The schedule is built from the scope, not from a standard number. It depends on what demolition uncovers, whether the drain or valve moves, the waterproofing system and the cure or test time its manufacturer calls for, the tile, and the glass, which is usually measured after tile and made to fit. Any building or DOB approval comes before demolition and can take longer than the work itself. A schedule comes with the written proposal, after the site visit.

Sources

  1. Do I Need a Permit?, NYC Department of Buildings. Accessed 2026-11-28.
  2. Project Requirements for Owner: Plumbing, NYC Department of Buildings. Accessed 2026-11-28.
  3. Renovating Kitchens & Bathrooms, NYC Department of Buildings. Accessed 2026-11-28.
  4. Service Notice: Condo/Co-Op Board Added as a Stakeholder in DOB NOW: Build (January 8, 2026), NYC Department of Buildings. Accessed 2026-11-28.

Planning a tub-to-shower conversion in New York City?

Call or email us to talk it through and arrange a consultation.

CallRequest a Consultation